start up

start-up and commissioning plays a major role in the transitioning plants from construction to operation. To ensure that equipment or system is construction-complete, that it can be operated safely, and that the initial running of the equipment or system has been performed, Mikhak can help its clients by:

  • Designing Audit and ensuring Start-up concerns are addressed
  • Preparing Startup / Commissioning / FAT / SAT documentation
  • Assembling Documentation Package
  • Conducting Factory Acceptance Testing (FAT)
  • Conducting Site Acceptance Testing (SAT)
  • Detailed Punch listing to Ensure Construction Completion
  • Initial Testing of Process Equipment and Critical Utilities Prior to Validation
  • Commissioning of Non-Critical Utility Systems